CHEVRON / KT PIPELINES 
Barrow Island

Location

Barrow Island

Category

Gas and Oil

Expertise 

For the last 4 years Howell Davies has had a team working on the construction of the facility on Barrow Island. This project is made up of 6, 12.5 km lines running parallel. Together with a section 900 metres long of onshore/offshore directional drill under beach. Pipe welded has been 34” x 34.5mm to 47.2mm; 10” diameter x 34.5mm wall thickness; 8” x 35mm to 13mm; 6” x 12mm and 13mm.

Processes

Serimax Auto Systems, Manual STT Root, Flux Core – Hot pass/Fill and Cap.